|
Application and Fixing
To obtain optimum bond strength from the self-adhesive backing supplied on TD/GV
Damping Sheet follow these instructions:
1. Allow to stabilise at room temperature prior to use.
2. Apply in the horizontal or vertical plane. Where there is a requirement for
the damping sheet to be applied to the underside of a substrate, the substrate
should be turned upside down if at all possible. The damping sheet can then be
applied to the underside from the horizontal or vertical plane and left until
the adhesive has fully cured before turning the substrate back into its
correct position. If re-orientation of the substrate is not possible, the
damping sheet can be applied from the underside providing it is supported
against the substrate until the adhesive cures.
3. Clean and dry the substrate with an appropriate cleaner i.e. methylated
spirit or similar, so that it is free from oil, grease, rust, dust or any
other particles.
4. If possible gently preheat the damping sheet to 30°C and apply when the
ambient temperature is between 18°C and 25°C. Do not subject to direct flame.
5. Peel off the protective backing, position material onto substrate and apply
a constant forward and downward pressure to the surface of the damping sheet
to ensure it is securely fixed onto the substrate. A hard timber or steel
roller is recommended for this purpose.
6. Particular care must be taken to avoid forming air pockets between the
substrate and self-adhesive backing as this will weaken the bond and reduce
the vibration damping performance
|